One Stop Mercury Control
Solution from IAC
We’ve done the hard work for you....
IAC Developed your mercury removal strategy
IAC Three Step Program
1. Demonstration
IAC Fully Equipped 48’ Long Test Rig Trailer
2. Select PAC Sorbent
Gas Stream Removal Testing at Evolution
3. Install Permanent PAC Equipment
IAC Design/Build TurnKey Solution
LITERATURE Mercury Control
PAC Injection for Mercury Control
We provide:
•Testing rig
•Nozzles and manifolds
•Introductive PLC controls for sorbent usage documentation
•Labor for installation
•Technical staff
|